A high tech facility was required for this technology
driven company.
Completed in 1997 this state of the art facility was a
construction management project with extensive owner involvement during more
than 70 project meetings. A signature facility was required for a company that
is in the forefront of the research and development of emerging technologies.
The production area is on the first floor with the engineering, cafeteria, gym,
resource library, conference room and executive offices on the second level.
Interior finish features include mahogany trim, imported tile and ceiling tiles
configured to simulated clouds with a cathedral ceiling. |